None
Geography
Erection of 2 storey side extension, replacement rear extension, front porch and conversion of loft space.
- Dataset
- Planning application
- Reference
- 23/01180/FUL
Geography
Erection of 2 storey side extension, replacement rear extension, front porch and conversion of loft space.
Geography
Erection of 2 x non-illuminated fascia signs (0.98m x 1.4m each) located on gates at the entrance to the wind farm
Geography
Erection of a single terminal pole and stay wire for a new under ground cable to connect to the pole, to allow the removal of 11 poles and associated overhead cables (C901095-0001)
Geography
Consent to crown lift five Sycamore trees (T1, T2, T3, T4 and T5) to approximately five meters above ground level and fell two dead Elm trees (T6 and T7). The trees are subject to G3 and G5 of Doncaster Borough Council Tree Preservation Order (No.216) 2000 Scawsby / Scawthorpe.
Geography
Erection of two control kiosks within Norton Sewage Treatment Works.
Geography
Outline application for travel interchange for bus, road and rail transport with first floor retail and associated high level decked car parking on approx. 6.30ha of land (being variation of condition 20 of planning application 98/4051/P granted 27/07/1999, to seek approval for closure to access to the public between the travel interchange and city centre through the shopping centre at certain times: North Mall route to be closed 15 minutes after Doncaster Interchange published public transport times and re-opened 15 minutes before, South Mall route to be closed 30 minutes after shop opening times and re-opened 30 minutes before) (being resubmission of application 22/02548/FULM)
Geography
Erection of single storey rear extension.
Geography
Erection of single storey extension to the side and part two part single storey extension to the rear following demolition of concrete block garage.
Geography
Erection of single storey rear and side extension
Geography
Erection of one new chemical dosing kiosk and two new motor control centre (MCC) kiosks at the existing operational Sandall WwTW site.