Maximum Staff / Carers
Policy
The maximum number of permanent staff/carers at the property at any one time shall be 4 unless otherwise approved in writing by the Local Planning Authority.
- Dataset
- Planning condition
- Reference
- U0107475
Policy
The maximum number of permanent staff/carers at the property at any one time shall be 4 unless otherwise approved in writing by the Local Planning Authority.
Policy
A staff/carer logbook shall be maintained at all times which details staff/carer name, dates of site visit and entry and exit times. The staff/carer logbook shall be maintained for the lifetime of the development and each staff/carer logbook shall be retained for a minimum of 12 months. The staff/carer logbook shall be made available for inspection by the Local Planning Authority within two working days of a verbal or written request being received.
Policy
A residents' logbook shall be maintained at all times which details names and dates of residency. The residents' logbook shall be maintained for the lifetime of the development and each residents' logbook shall be retained for a minimum of 12 months. The residents' logbook shall be made available for inspection by the Local Planning Authority within two working days of a verbal or written request being received.
Policy
Before the development is brought into use, that part of the site to be used by vehicles shall be surfaced, drained and where necessary marked out in a manner to be approved in writing by the local planning authority.
Policy
The vehicle turning space as shown on the approved plans shall be constructed before the development is brought into use and shall thereafter be maintained as such.
Policy
The development hereby permitted shall be carried out in complete accordance with the details shown on the amended plans referenced and dated as follows: Location Plan. Date received: 13/02/2023. Site Plan. Date received: 13/02/2023. Existing and proposed plans. Revision 'B'. Date received: 22/02/2023.
Policy
The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Location plan; Received 25/01/2023 Proposed plan (photo); Received 25/01/2023
Policy
The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Plan revision B received 08 March 2023 Amended site plan received 08 March 2023
Policy
Before the first occupation of the development hereby approved, a surface water sustainable system (SuDS) shall be designed and installed on the approved development. The system shall be designed such that no additional or increased rate of flow of surface water will drain to any water body or adjacent land and that there is capacity in the installed drainage system to contain below ground level the run-off from a 1 in 100 year rainfall event plus 40% on stored volumes as an allowance for climate change as set out in National Planning Practice Guidance. In the event that a SuDS compliant design is not reasonably practical, then the developer shall seek written approval from the local planning authority for an alternative system prior to the first occupation of the development.
Policy
The materials to be used in the construction of the external surfaces of the development hereby permitted shall be consistent in terms of colour, size and texture with those used in the existing building.