8,643 results

  • Landscaping

    Policy

    No development shall take place on the site until a detailed landscaping scheme has been submitted to and approved in writing by the LPA which shall include the following: i) A planting plan and schedule of trees including replacement trees along the site frontage (behind the wall); ii) Details of soft and hard landscaping; and iii) A landscape and establishment specification, noting the requirement to replace any trees which do not become established. The agreed scheme shall be implemented prior to the first occupation of the site or in an alternative timescale to be agreed in writing with the LPA.

    Reference
    U0108453
  • WSI

    Policy

    No development, including any demolition and groundworks, shall take place until the applicant, or their agent or successor in title, has submitted a Written Scheme of Investigation (WSI) that sets out a strategy for archaeological investigation of the site including a permanent historic record of the cottage and barn to be converted and this has been approved in writing by the LPA. The WSI shall include: i) The programme and method of site investigation and recording; ii) The recording specification for the historic buildings; iii) The requirement to seek preservation in situ of identified features of importance; iv) The programme for post-investigation assessment; v) The provision to be made for analysis and reporting; vi) The provision to be made for publication and dissemination of the results; vii) The provision to be made for deposition of the archive including the historic building record created; viii) Nomination of a competent person/persons or organisation to undertake the works; and ix) The timetable for completion and submission of the historic building record and of all site investigation and post-investigation works. Thereafter the development shall only take place in accordance with the approved WSI and the development shall not be brought into use until the LPA has confirmed in writing that the requirements of the WSI have been fulfilled or alternative timescales agreed.

    Reference
    U0108454
  • Drainage

    Policy

    Prior to the commencement of any work on site, a detailed scheme for the foundation design and all new ground works, including foul, surface water and land drainage systems and all related works necessary to drain the site shall have been submitted to and approved in writing by the LPA and the development shall be carried out in accordance with the approved details.

    Reference
    U0108455
  • Contamination

    Policy

    Should any unexpected significant contamination be encountered during development, all associated works shall cease and the LPA be notified in writing immediately. In this circumstance where significant contamination is encountered, a Phase 3 remediation and Phase 4 verification is to be submitted to and approved by the LPA. The associated works shall not recommence until the reports have been approved by the LPA.

    Reference
    U0108456
  • Soil Importation

    Policy

    Any soil or soil forming materials brought to site for use in garden areas, soft landscaping, filing and level raising shall be tested for contamination and suitability for use on site. Proposals for contamination testing including testing schedules, sampling frequencies and allowable contaminant concentrations (as determined by appropriate risk assessment) and source material information shall be submitted to and be approved in writing by the LPA prior to any soil or soil forming materials being brought onto site. The approved contamination testing shall then be carried out and verification evidence submitted to and approved in writing by the LPA prior to any soil and soil forming material being brought on to site.

    Reference
    U0108457
  • PD Restriction

    Policy

    Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (No.596) (England) Order 2015, Article 3, Schedule 2: Part 1 (or any subsequent order or statutory provision revoking or re-enacting that order) no additions, extensions or other alterations other than that expressly authorised by this permission shall be carried out without prior permission of the LPA.

    Reference
    U0108458
  • PD Restriction

    Policy

    Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (No.596) (England) Order 2015, Article 3, Schedule 2: Part 1 (or any subsequent order or statutory provision revoking or re-enacting that order) no development shall be carried out on any part of the land other than that hereby permitted without the prior permission of the local planning authority.

    Reference
    U0108459
  • PD Restriction

    Policy

    Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (No.596) (England) Order 2015, Article 3, Schedule 2: Part 1 (or any subsequent order or statutory provision revoking or re-enacting that order) no additional windows shall be created or other alterations made to the dwelling and/or extension hereby permitted without the prior permission of the local planning authority.

    Reference
    U0108460
  • PD Restriction

    Policy

    Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (No.596) (England) Order 2015, Article 3, Schedule 2: Part 14 (or any subsequent order or statutory provision revoking or reenacting that order) no solar equipment shall be installed without prior permission of the LPA.

    Reference
    U0108461
  • Ecological Mitigation

    Policy

    Within one month of the commencement of the development, an ecological enhancement plan shall be submitted to the local planning authority for approval in writing. This plan shall be based on the measures outlined in section 4.4 'Species' of the Preliminary Ecological Appraisal (18775) (dated August 2022). All of the measures shall be implemented prior to the first use of the site or an alternative timescale to be approved in writing with the local planning authority.

    Reference