Search for planning and housing data

Warning This product is still in development, so the data may be incomplete and does not yet cover all of England.

Filters

Typology

Typology

Dataset

1 selected

Dataset

Location

Location

Organisation

Organisation

Period

Period

Entry date

Which date are you interested in?

For example, 27 3 2021

Do you want to see entries since the date or after the date?

Clear

8,643 results

  • Trees: Protection and Management

    Policy

    The scheme of protection for all retained trees, including tree management, ground protection measures and the erection of impact resistant protective barriers shall be implemented in full accordance with the requirements contained within the approved plans and particulars (ref. Selwyn Trees Tree Protection Plan dated 28.02.2020) before any equipment, machinery or materials have been brought on to site for the purposes of the development. The local planning authority shall be notified of implementation and shall visit site to approve the setting out of the site and location of protective barriers prior to the commencement of development. Thereafter tree protection practices shall be implemented and monitored in full accordance with the approved scheme until all equipment, machinery and surplus materials have been removed from the site, unless the local planning authority gives its written approval to any variation. Nothing shall be stored or placed in any area fenced in accordance with this condition and the ground levels within those areas shall not be altered, nor shall any excavation be made, without the written consent of the local planning authority.

    Reference
    U0108685
  • Scheme of Tree Planting

    Policy

    Unless as shall be specifically approved in writing by the Local Planning Authority, the scheme of tree planting shown on the approved site plan ref: Drawing No. 2009.2.1 L dated 21.03.22 shall be implemented in full accordance with the approved details during the first available planting season following the completion of the development hereby granted and the local planning authority notified in writing within 7 working days of the completion of the landscape works to inspect and approve practical completion in writing. The trees shall be container grown and of extra-heavy standard (14-16cm) size and compliant with British Standard 3936: Part 1: 1992 Specification for Trees. Any part of the scheme which fails to achieve independence in the landscape or is damaged or removed within five years of planting shall be replaced during the next available planting season in full accordance with the approved scheme, unless the local planning authority gives its written approval to any variation.

    Reference
    U0108686
  • Approved plans

    Policy

    The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Drawing Title: Planning Drawings. Drawing No: 023/018/PD. Drawing Date: March 2023. To ensure that the development is carried out in accordance with the application as approved.

    Reference
    U0108689
  • Implementation

    Policy

    The development to which this permission relates must be begun not later than the expiration of three years beginning with the date of this permission.

    Reference
    U0108693
  • Approved Plans

    Policy

    The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: - Location Plan (563_PL_01) - Proposed Site Plan (563_PL_02) - Floor Plan and External Elevations (002 Rev C) - Floor Plan and External Elevations (002 Rev C) - General Arrangement Drawings (001 Rev A)

    Reference
    U0108694
  • Opening Hours

    Policy

    The hours of opening shall be limited to: Mondays to Saturdays inclusive 0700 hours to 1900 hours Sundays 1000 hours to 1700 hours

    Reference
    U0108695
  • Temporary Period

    Policy

    The buildings hereby permitted shall be for a limited period being the period of 10 years from the date of this decision. At the end of this period, the buildings hereby permitted shall be removed and the land restored in accordance with a scheme previously submitted to and approved in writing by the local planning authority.

    Reference
    U0108696
  • Approved Plans

    Policy

    The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: - Location Plan (563_PL_01) - Proposed Site Plan (563_PL_02) - Floor Plan and External Elevations (002 Rev C) - Floor Plan and External Elevations (002 Rev C) - General Arrangement Drawings (001 Rev A)

    Reference
    U0108698
  • Maintenance of Advertisement

    Policy

    Any advertisement displayed and any site used for the display of advertisements, shall be maintained in a condition that does not impair the visual amenity of the site.

    Reference
    U0108699