Implementation
Policy
The development to which this permission relates must be begun not later than the expiration of three years beginning with the date of this permission.
- Dataset
- planning-condition
- Reference
- U0108701
Policy
The development to which this permission relates must be begun not later than the expiration of three years beginning with the date of this permission.
Policy
The development hereby permitted shall be carried out in complete accordance with the details shown on the amended plans referenced and dated as follows: - Proposed Plans, drawing no. 3738-01F - Received on 04/04/2023 - Arboricultural Survey Report & Generic Method Statement - Received 19/11/21 - Tree Layout Rev C - Received 19/11/21 - Preliminary Roost Assessment - Received 02/02/22
Policy
Before the first occupation of the extension hereby permitted, the bathroom and ensuite windows at first floor level on the northern elevation, and the bedroom window at first floor level on the eastern elevation on the approved plans shall be permanently obscure to a level of obscurity to Pilkington level 3 or above or its technical equivalent by other manufactures and shall be permanently retained in that condition thereafter, unless otherwise approved in writing by the local planning authority.
Policy
Within two months of the commencement of development, an ecological enhancement plan shall be submitted to the local planning authority for approval in writing. This plan shall include details of the following measures based on the proposals set out in Steven Whitcher 20220001-PRA, 27th January 2022 Section 5 'Recommendations' all of which shall be implemented prior to the first occupation of the site or an alternative timescale to be approved in writing with the local planning authority
Policy
The erection of impact resistant barriers for the protection of all of the retained trees shall be undertaken in accordance with the approved plans and particulars (reference Block Plan 'Tree Layout' Rev. C; section 3 of Gloaming Tree Surgery and Arboricultural Consultancy 'Arboricultural Survey Report & Generic Method Statement; and figures 1-3 of the Generic Method Statement) and the local planning authority notified of implementation to approve the setting out of the tree protection scheme before any equipment, machinery or materials have been brought on to site for the purposes of the development. Thereafter, all tree protection shall be maintained in full accordance with the approved details until all equipment, machinery and surplus materials have been removed from the site, unless the local planning authority gives its written approval to any variation. Nothing shall be stored or placed in any area fenced in accordance with this condition and the ground levels within those areas shall not be altered, nor shall any excavation be made, without the written consent of the Local Planning Authority.
Policy
The development hereby granted shall not be begun until details of the foul, surface water and land drainage systems and all related works necessary to drain the site have been submitted to and approved by the Local Planning Authority. These works shall be carried out concurrently with the development and the drainage system shall be operating to the satisfaction of the Local Planning Authority prior to the occupation of the development.
Policy
Should any unexpected significant contamination be encountered during development, all associated works shall cease and the Local Planning Authority (LPA) be notified in writing immediately. A Phase 3 remediation and Phase 4 verification report shall be submitted to the LPA for approval. The associated works shall not re-commence until the reports have been approved by the LPA.
Policy
The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Title: Location and Block Plans. Drawing No: DRB 1. Date: 10.03.2023. Title: Existing and Proposed Floor Layouts and Elevations. Drawing No: DRB 2. Date: 10.03.2023.
Policy
The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Sheet Name: Location and Block Plan. Date: 04/03/23. Project Number: 1902. Drawing Number: BL101. Sheet Name: Proposed Ground Floor Plan. Date: 04/03/23. Project Number: 1902. Drawing Number: P101. Sheet Name: Proposed Elevations. Date: 04/03/23. Project Number: 1902. Drawing Number: P103. To ensure that the development is carried out in accordance with the application as approved.
Policy
The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Title: Fenwick House, Shaw Lane, Fenwick, Doncaster (Proposed Site Plan). Scale of 1:500. Title: Proposed Shed/Garage (Proposed Floor Plan). Scale of 1:50. Titles: Elevation Plans. Scale of 1:50.