  • Approved plans

    Policy

    The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Sheet Name: Location and Block Plan. Date: 15/03/23. Project Number: 1921. Drawing Number: BL101. Sheet Name: Proposed Plans. Date: 15/03/23. Project Number: 1921. Drawing Number: P101.

    Reference
    U0108852
  • Implementation

    Policy

    The development to which this permission relates must be begun not later than the expiration of three years beginning with the date of this permission.

    Reference
    U0108887
  • Approved Plans

    Policy

    The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: - Existing Site & Location Plan (01A) (Feb 2023) - Proposed Elevations (03) (March 2023) - Proposed Site Location & Layout Plans (02A) (Feb 2023

    Reference
    U0108888
  • Temporary Period

    Policy

    The development hereby permitted shall be for a limited period being the period of 3 years from the date of this decision. At the end of this period, the site compound including associated structures and buildings hereby permitted shall be removed and the land restored in accordance with a scheme previously submitted to and approved in writing by the local planning authority.

    Reference
    U0108889
  • Yorkshire Water Condition - Storage Tank

    Policy

    Any liquid storage tanks should be located within a bund with a capacity of not less than 110% of the largest tank or largest combined volume of connected tanks.

    Reference
    U0108890
  • Yorkshire Water Condition - CEMP

    Policy

    There shall be no construction of new buildings on site prior to the completion of a Construction Management Plan (CEMP) to understand the impact of planning permission on the sewerage system. Furthermore, the findings and recommendations of the CEMP must be implemented and maintained for the lifetime of the development.

    Reference
    U0108891
  • Yorkshire Water - Piped Discharge

    Policy

    There shall be no piped discharge of surface water from the development prior to the completion of surface water drainage works, details of which will have been submitted to and approved by the Local Planning Authority. If discharge to public sewer is proposed, the information shall include, but not be exclusive to:- a) evidence to demonstrate that surface water disposal via infiltration or watercourse are not reasonably practical; b) evidence of existing positive drainage to public sewer and the current points of connection; and c) the means of restricting the discharge to public sewer to the existing rate less a minimum 30% reduction, based on the existing peak discharge rate during a 1 in 1 year storm event, to allow for climate change.

    Reference
    U0108892
  • Drainage DA01

    Policy

    The development hereby granted shall not be begun until details of the foul and surface water systems and all related works necessary to drain the site have been submitted to and approved by the Local Planning Authority. These works shall be carried out concurrently with the development and the drainage system shall be operating prior to the occupation of the development.

    Reference
    U0108893
  • Drainage DN14

    Policy

    Before the development is commenced permeability, tests (in accordance with BRE365) shall be carried out to prove that ground conditions are suitable for a soakaway type septic tank effluent disposal system. The test results shall be submitted to and approved by the Local Planning Authority prior to the commencement of the development.

    Reference
    U0108894
  • Drainage D015

    Policy

    Details of the proposed septic tank shall be submitted to and approved in writing by the Local Planning Authority prior to the commencement of the development. The septic tank shall not be installed until soakaway tests have been carried out in connection with condition DN14 The septic tank shall be operating prior to the occupation of the development and maintained for the lifetime of the development.

    Reference