8,643 results

  • External Materials

    Policy

    The materials used shall match those set out on the submitted Application Form (PP-11988682).

    Reference
    U0109143
  • FRA Compliance

    Policy

    The development shall be carried out in accordance with the submitted flood risk assessment (ref 3 Mar 2023 / Richard Hill ) and the following mitigation measures it details: - Finished floor levels shall be set no lower than the existing hard standing These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/ phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development.

    Reference
    U0109144
  • Implementation

    Policy

    The development to which this permission relates must be begun not later than whichever is the later of the following dates: i) The expiration of three years from the date of this permission; or ii) The expiration of two years from the final approval of the reserved matters or in the case of different dates the final approval of the last such matter to be approved.

    Reference
    U0109159
  • Reserved Matters Submission

    Policy

    In the case of the reserved matters, application for approval must be made not later than the expiration of three years beginning with the date of this permission.

    Reference
    U0109160
  • Reserved Matters Pre Commencement

    Policy

    Approval of the details of the access, appearance, landscaping, layout and scale of the development (hereinafter referred to as reserved matters) shall be obtained from the Local Planning Authority before the commencement of any works.

    Reference
    U0109161
  • Approved Plans

    Policy

    The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Site and Location Plan (PC554/01)

    Reference
    U0109162
  • Drainage DA01

    Policy

    The development hereby granted shall not be begun until details of the foul and surface water systems and all related works necessary to drain the site have been submitted to and approved by the Local Planning Authority. These works shall be carried out concurrently with the development and the drainage system shall be operating prior to the occupation of the development.

    Reference
    U0109163
  • Piped Discharge

    Policy

    There shall be no piped discharge of surface water from the development prior to the completion of the approved surface water drainage works and no buildings shall be occupied or brought into use prior to completion of the approved foul drainage works.

    Reference
    U0109164
  • Ecological Enhancement

    Policy

    On submission of reserved matters an ecological enhancement plan shall be submitted to the local planning authority for approval in writing. This plan shall include details of the following measures, all of which shall be implemented prior to the first occupation of the site or an alternative timescale to be approved in writing with the local planning authority: Photographic evidence of the implemented measures must be submitted to the local planning authority: MEASURES -One integrated bat boxes of the Ibstock Bat Brick type or similar shall be built the dwelling on a west or south facing orientation above 4m from the ground and away from external artificial lighting. - One sparrow nest box shall be integrated or surface mounted onto the dwelling at eaves level on an east or west orientation.

    Reference
    U0109165