8,643 results

  • Approved Plans

    Policy

    The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans and specifications. Site Plan. Date received: 27/03/2023 Location Plan. Date received: 27/03/2023 Existing and proposed plans. Date received: 27/03/2023

    Reference
    U0109207
  • Obscure Glazing

    Policy

    Before the first occupation of the building/extension hereby permitted, the windows serving the first floor en-suite as indicated on the approved plans shall be permanently obscure to a level of obscurity to Pilkington level 3 or above or its technical equivalent by other manufactures and shall be permanently retained in that condition thereafter, unless otherwise approved in writing by the local planning authority.

    Reference
    U0109208
  • CMP

    Policy

    Notwithstanding the submitted details, no development shall commence until a Construction Method Statement has been submitted to and approved in writing by the Local Planning Authority. The Construction Method Statement shall include: - Details of the methods to be used to control dust, noise, vibration, lighting, potential water pollution and other emissions from the site; - The location of all temporary buildings and compound areas and arrangements for their removal following completion of construction; - The parking of vehicles of site operatives and visitors - Details of areas to be used for the storage of plant and construction materials and waste; - Details of temporary lighting arrangements; - Hours of construction work; - Details of how the public rights of way through the site will be managed; - Measures to ensure that construction vehicles do not deposit mud or debris on the public highway; - A scheme for the routing of construction vehicles accessing the site; and - Details of any construction earthworks methodology. - Details of traffic management - Details of final landscaping (including hedgerow replacement) and site restoration

    Reference
    U0109209
  • Cable Crossing

    Policy

    The cable crossing of the Sheffield and South Yorkshire Navigation shall not take place until full details of the corssing, including details of any drilling, the depth of any cable, appearance of any above ground apparatus, and associated installation methodology, has been provided to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved details.

    Reference
    U0109210
  • CEMP EA

    Policy

    The development hereby permitted must not be commenced until such time as a Construction Environmental Management Plan (CEMP) has been submitted to, and approved in writing by, the local planning authority. This plan should: - ensure no raising of ground levels within the flood storage area - provide details of the cable construction/installation methods The scheme CEMP shall be fully implemented and subsequently maintained, in accordance with the scheme's timing/phasing arrangements, or within any other period as may subsequently be agreed, in writing, by the local planning authority.

    Reference
    U0109211
  • Approved plans

    Policy

    The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Drawing No. TM-01-P16 Rev 02 - Site Location Plan Drawing No. TM-01-P17 - 33kV Tertiary Connection Cable Arrangement Between the NG Substation and the Solar Substation

    Reference
    U0109212
  • Amended/approved plans

    Policy

    The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the amended/approved plans listed below: Amended plans: Title: Block Plan. Rev: B. Scale: 1:500. Received by City of Doncaster Council on the 13/04/2023. Titles: Existing and Proposed Elevation and Floor Plans. Plan Revision 'B'. Received by City of Doncaster Council on the 13/04/2023.

    Reference
    U0109215
  • Plans

    Policy

    The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Design and access statement received 28th February 2023 Site plan received 28th February 2023 Proposed floor plan received 28th February 2023 Proposed elevations received 28th February 2023

    Reference
    U0109216
  • Materials

    Policy

    Prior to the commencement of the relevant works, details of the materials to be used in the construction of the external surfaces of the development, including the roof, shall be submitted to and approved in writing by the Local Planning Authority. The Development shall be carried out in accordance with the approved details. The materials to be used throughout the development shall be consistent in terms of colour, size and texture with the approved details.

    Reference
    U0109217
  • In accordance with plans

    Policy

    The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Change of use plan MEX 03GL Proposed Change of Use Location and Site Plans 01

    Reference
    U0109221