8,643 results

  • Implementation

    Policy

    The development to which this permission relates must be begun not later than the expiration of three years beginning with the date of this permission.

    Reference
    U0109794
  • Approved Plans

    Policy

    The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: - Location Plan (April 2023) - Proposed Stables (March 2022) - Proposed Stables (March 2022)

    Reference
    U0109795
  • Ecological Enhancement

    Policy

    Prior to the commencement of development, an ecological enhancement plan shall be submitted to an approved in writing by the Local Planning Authority. This plan shall include details of the following measures, all of which shall be implemented prior to the first use of the site or an alternative timescale to be approved in writing with the local planning authority and photographic evidence of implementation shall be submitted the local planning authority: -Either swallow nesting provision is installed in two of the stables, or; -Two sparrow terrace nest boxes are attached to the external structure of the stables; -The hedge to the rear of the stable block to be retained, protected and enhanced through gapping up.

    Reference
    U0109796
  • Drainage DA01

    Policy

    The development hereby granted shall not be begun until details of the foul, surface water and land drainage systems and all related works necessary to drain the site have been submitted to and approved by the Local Planning Authority. These works shall be carried out concurrently with the development and the drainage system shall be operating prior to the first use of the development.

    Reference
    U0109797
  • Approved plans

    Policy

    The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Sheet Name: Location and Block Plan. Date: 18/04/23. Project No: 1949. Drawing No: BL101. Sheet Name: Proposed Plans. Date: 18/04/23. Project No: 1949. Drawing No: P101. Sheet Name: Proposed Elevations. Date: 18/04/23. Project No: 1949. Drawing No: P102.

    Reference
    U0109807
  • Approved Plans

    Policy

    The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: - Location Plan (TQRQM23103135806908) - Gym for Mr Male (Plan Revision 'A')

    Reference
    U0109809
  • Opening Hours

    Policy

    The hours of opening shall be limited to: Mondays to Fridays 9:00 to 20:00; Saturdays 9:00 to 17:00; Not at all on Sundays or Bank Holidays.

    Reference
    U0109810
  • Number of Customers Restricted

    Policy

    The building shall run sessions for a maximum of 8 customers at any one time.

    Reference
    U0109811
  • Amplified Sound

    Policy

    Amplified sound arising from the permitted use shall not be audible at the property boundary.

    Reference
    U0109812
  • Implementation

    Policy

    The development to which this permission relates must be begun not later than the expiration of three years beginning with the date of this permission.

    Reference
    U0109813