Search for planning and housing data

Warning The data may be incomplete and not yet cover all of England. We're working to improve its availability and quality.

Filters

Typology

Typology

Dataset

1 selected

Dataset

Location

Location

Organisation

Organisation

Period

Period

Entry date

Which date are you interested in?

For example, 27 3 2021

Do you want to see entries since the date or after the date?

Clear

8,643 results

  • Approved Plans

    Policy

    The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans and specifications. OS Plan (site plan). Drawing number: 2023/025/05. Date received: 24/04/2023. Location plan. Drawing number 2023/-25/06. Date received: 24/04/2023. Scheme elevations (proposed elevations). Drawing number: 2023/025/04C. Date received: 21/04/2023. Scheme plans (proposed floor plans). Drawing number: 2023/025/03C. Date received: 21/04/2023.

    Reference
    U0109884
  • Approved Plans

    Policy

    The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans and specifications. Location plan and site plan. Date received: 26/04/2023 Proposed plans (floor plan and elevation). Date received: 26/04/2023

    Reference
    U0109886
  • Approved Plans

    Policy

    The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans and documents listed below: Proposed site plan drwg no 19.010.2 Rev J Proposed plans drwg no 19.010.5 Rev C (Elevations and ground floor plan) Proposed plans drwg no 19.101.5 Rev C (first floor plan)

    Reference
    U0109897
  • Tree Protection

    Policy

    The erection of impact resistant barriers for the protection of the retained trees shall be undertaken in accordance with the approved plans and particulars (Site Plan ref. 19.010.2 Rev. J dated February 2023) and the local planning authority notified of implementation to approve the setting out of the tree protection scheme before any equipment, machinery or materials have been brought on to site for the purposes of the development. Thereafter, all tree protection shall be maintained in full accordance with the approved details until all equipment, machinery and surplus materials have been removed from the site, unless the local planning authority gives its written approval to any variation. Nothing shall be stored or placed in any area fenced in accordance with this condition and the ground levels within those areas shall not be altered, nor shall any excavation be made, without the written consent of the Local Planning Authority.

    Reference
    U0109898
  • Landscaping

    Policy

    Unless as shall be specifically approved in writing by the Local Planning Authority, the scheme of landscaping shown on plan ref: BR-32-LA2 dated January 2021 shall be implemented in full accordance with the approved details during the first available planting season following the completion of the development hereby granted and the local planning authority notified in writing within 7 working days of the completion of the landscape works to inspect and approve practical completion in writing. Any part of the scheme which fails to achieve independence in the landscape or is damaged or removed within five years of planting shall be replaced during the next available planting season in full accordance with the approved scheme, unless the local planning authority gives its written approval to any variation.

    Reference
    U0109899
  • Boundary treatment

    Policy

    Prior to the implementation of the relevant site works details of the new boundary treatment shall be submitted to and agreed in writing by the local planning authority. Such details shall include details of the height and design of the walls, piers and gates, as well as details or samples of the materials to be used in its construction.

    Reference
    U0109900
  • Double glazing

    Policy

    All glazing on the front elevation of Plot 1 facing Bawtry Road shall be fitted with enhanced double glazing with a rating of 32 dB Rw, featuring acoustic trickle vents, and the enhanced glazing shall be retained thereafter.

    Reference
    U0109901
  • Construction works

    Policy

    Construction works shall not take place outside 8am to 6pm Mondays to Fridays and 9am to 1pm on Saturdays or at any time on Sundays or Bank Holidays.

    Reference
    U0109902
  • C3 to C4

    Policy

    Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (No.596) (England) Order 2015, Article 3, Schedule 2, Part 3, Class L (or any subsequent order or statutory provision revoking or re-enacting that order), the dwellinghouses hereby approved shall be retained as single dwellinghouses (class C3) in perpetuity and shall not occupied as Homes in Multiple Occupation (class C4) unless otherwise approved in writing by the local planning authority.

    Reference
    U0109903
  • Obscure glazing

    Policy

    Before the first occupation of the building/extension hereby permitted, the walk-in wardrobe and en suite bathroom windows on the south-east-facing side elevation of the Plot 1 dwelling as indicated on the approved plans shall be fitted with obscure glazing to a level of obscurity of Pilkington level 3 or above, or its technical equivalent by other manufactures, and shall be permanently retained in that condition thereafter, unless otherwise approved in writing by the local planning authority.

    Reference
    U0109904