Search for planning and housing data

Warning The data may be incomplete and not yet cover all of England. We're working to improve its availability and quality.

Filters

Typology

Typology

Dataset

1 selected

Dataset

Location

Location

Organisation

Organisation

Period

Period

Entry date

Which date are you interested in?

For example, 27 3 2021

Do you want to see entries since the date or after the date?

Clear

8,643 results

  • Landscape scheme

    Policy

    The scheme of landscaping shown on plan ref: V0848 L01 Revision K shall be implemented in full accordance with the approved details during the first available planting season following the commencement of the development hereby granted and the local planning authority notified in writing within 7 working days of the completion of the landscape works to inspect and approve practical completion in writing. Thereafter the landscape scheme shall be maintained in accordance with the approved details. Any tree or shrub planted as part of the scheme that is removed or is found to be dying, diseased or seriously damaged within five years of practical completion of the planting works shall be replaced during the next available planting season in full accordance with the approved scheme, unless the local planning authority gives its written approval to any variation.

    Reference
    U0110254
  • Materials Agreed

    Policy

    The development shall be carried out in complete accordance with the approved details for the signage, external building materials, boundary treatments (including heights), and lighting columns.

    Reference
    U0110255
  • Renewables

    Policy

    No development shall commence on site until a report (the initial SAP report carried out as part of Building Regulations will be sufficient information in many cases) has been submitted to the local planning authority and approved in writing from them, explaining how CO2 emissions from the development will be reduced by providing at least 10 Percent of the development's energy through on-site renewable energy equipment or improvements to the fabric efficiency of the building. The carbon savings, which result from proposed measures, will be above and beyond what is required to comply with Part L of Building Regulations. Unless otherwise agreed in writing by the Local Planning Authority, the development shall then proceed in accordance with the approved report. Before any building is occupied or sold, the local planning authority shall be satisfied that the measures have been installed, which will enable the planning condition to be fully discharged.

    Reference
    U0110256
  • SW from hardstanding

    Policy

    Surface water draining from areas of hard standing shall be passed through a trapped gully or series of trapped gullies, prior to being discharged into any watercourse, soakaway or surface water sewer. The gully/gullies shall be designed and constructed to have a capacity compatible with the area being drained, shall be installed prior to the occupation of the development and shall thereafter be retained and maintained throughout the lifetime of the development. Clean roof water shall not pass through the gully/gullies.

    Reference
    U0110257
  • SW via interceptor

    Policy

    All surface water run-off from the site, excepting roof water, shall be discharged to the public surface water sewer/land drainage system or Highway Drain via a suitable oil/petrol/grit interceptor in accordance with details submitted and agreed with the Local Planning Authority.

    Reference
    U0110258
  • BREEAM for non residential

    Policy

    Before the development commences, a BREEAM pre-assessment, or equivalent assessment, shall be submitted for approval demonstrating how BREEAM 'Very Good' will be met. Unless otherwise agreed, the development must take place in accordance with the approved assessment. Prior to the occupation of any building, a post construction review should be carried out by a licensed assessor and submitted for approval. This will enable the planning condition to be fully discharged. Advice should be sought from a licensed BREEAM assessor at an early stage to ensure that the required performance rating can be achieved. A list of licensed assessors can be found at www.breeam.org.

    Reference
    U0110259
  • Discharge of surface water

    Policy

    Discharge of surface water from the application site shall take place in accordance with details submitted to and approved by the local planning authority.

    Reference
    U0110260
  • Foul water disposal

    Policy

    Disposal of foul water drainage, including any balancing works and off-site works, shall take place in accordance with details submitted to and approved by the local planning authority.

    Reference
    U0110261
  • Foul Drainage

    Policy

    Unless otherwise approved in writing by the local planning authority, no buildings shall be occupied or brought into use prior to completion of the approved foul drainage works.

    Reference
    U0110262
  • Footway widened

    Policy

    Prior to the opening of the store, the existing footway along the application site frontage shall be widened to 2.0m.

    Reference
    U0110263