BiodiversStrategic Landscape Master Plan
Policy
The development shall be carried out in complete accordance with the Strategic Landscape Master Plan submitted and agreed.
- Dataset
- Planning condition
- Reference
- U0110519
Policy
The development shall be carried out in complete accordance with the Strategic Landscape Master Plan submitted and agreed.
Policy
The development shall be carried out in complete accordance with the submitted and agreed ecological management plan.
Policy
No development, including any demolition and groundworks, shall take place until the applicant, or their agent or successor in title, has submitted a Written Scheme of Investigation (WSI) that sets out a strategy for archaeological investigation and this has been approved in writing by the Local Planning Authority. The WSI shall include: o The programme and method of site investigation and recording. o The requirement to seek preservation in situ of identified features of importance. o The programme for post-investigation assessment. o The provision to be made for analysis and reporting. o The provision to be made for publication and dissemination of the results. o The provision to be made for deposition of the archive created. o Nomination of a competent person/persons or organisation to undertake the works. o The timetable for completion of all site investigation and post-investigation works. Part B (pre-occupation/use) Thereafter the development shall only take place in accordance with the approved WSI and the development shall not be brought into use until the Local Planning Authority has confirmed in writing that the requirements of the WSI have been fulfilled or alternative timescales agreed.
Policy
Surface water from vehicle parking and hardstanding areas shall be passed through an interceptor of adequate capacity prior to discharge. Roof drainage should not be passed through any interceptor.
Policy
The foul, surface water and land drainage systems and all related works necessary to drain the site shall be carried out in accordance with the details submitted and agreed.
Policy
The scheme of landscaping shown on the Preliminary Landscape Proposals (Completed Development) plan ref: 2094 - PL002A dated 15 June 2016 shall be implemented in full accordance with the approved details during the first available planting season following the completion of the development hereby granted unless the local planning authority gives its written approval to any variation. The local planning authority shall be notified in writing within 7 working days of the completion of the landscape works to inspect and approve practical completion. Any tree or shrub planted as part of the scheme that is removed or is found to be dying, diseased or seriously damaged within five years of practical completion of the planting works shall be replaced during the next available planting season in full accordance with the approved scheme, unless the local planning authority gives its written approval to any variation.
Policy
Before the development is brought into use, that part of the site to be used by vehicles shall be surfaced, drained and where necessary marked out in accordance with the details submitted and agreed with the LOcal Planning Authority..
Policy
The erection of impact resistant barriers for the protection of any retained tree shall be undertaken in accordance with the approved Preliminary Landscape Proposals (Completed Development) plan ref: 2094 - PL002 dated 15 June 2016 and the local planning authority notified of implementation to approve the setting out of the tree protection scheme before any equipment, machinery or materials have been brought on to site for the purposes of the development. Thereafter, all tree protection shall be maintained in full accordance with the approved details until all equipment, machinery and surplus materials have been removed from the site, unless the local planning authority gives its written approval to any variation. Nothing shall be stored or placed in any area fenced in accordance with this condition and the ground levels within those areas shall not be altered, nor shall any excavation be made, without the written consent of the Local Planning Authority.
Policy
Prior to the occupation of the development hereby approved, details of electric vehicle charging provision shall be submitted to and approved in writing by the local planning authority. Installation shall comply with current guidance/advice. The dwellings/development shall not be occupied until the approved connection has been installed and is operational and shall be retained for the lifetime of the development. The development shall be carried out in accordance with the approved details.
Policy
The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Title Drawing: North Elevations. Project Number: PQ3100. Drawing Number: 04-E-N-01. Date: 24/05/2023. Title Drawing: Existing and Proposed. Project Number: PQ3100. Drawing Number: 04-L-xx-Sub. Date: 03/01/2023. Revision: C. Title Drawing: Site Plan 500. Project Number: PQ3100. Drawing Number: 03-P-Site-01. Date: 03/01/2023.