Flat/Green Roof
Policy
The flat/Green Roof, which will be created as a result of the development hereby granted, shall not be used at any time as a roof garden, terrace, patio or similar amenity area.
- Dataset
- planning-condition
- Reference
- U0111568
Policy
The flat/Green Roof, which will be created as a result of the development hereby granted, shall not be used at any time as a roof garden, terrace, patio or similar amenity area.
Policy
The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Title: 35, Windmill Drive, Wadworth, Doncaster (Proposed Site Plan). Scale: 1:500. Received by City of Doncaster Council on the 19.06.2023. Drawing Title: 35, Windmill Drive, Wadworth, Doncaster DN11 - 9BU. Date: 26/04/2022. DWG No: DN11 -9BU-35 3/4. Rev: E. Received by City of Doncaster Council on the 09.06.2023.
Policy
The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Location and site plans; Drawing no. FL-101; Received 22/05/2023 Proposed plans; Drawing no. FL-102; Received 15/03/2023
Policy
The development to which this permission relates must be completed not later than the expiration of three years beginning with the date of this permission.
Policy
The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: - Block Plan (GS22BP.1 Rev D) (received 13 July 2023) - Proposed Plans (GS22PB.1 Rev K) received 14 July 2023) - Proposed Elevations (GS22PE.1 Rev A) (received 13 July 2023)
Policy
The development shall be carried out in accordance with the submitted flood risk assessment (ref Dec 2022 / 3899 / A&F Consulting Engineers Ltd) and the following mitigation measures it details: - First floor finished floor levels shall be set no lower than 5.1 metres above Ordnance Datum (AOD) - Residential (more vulnerable) use shall be limited to the first floor and above - The existing ground floor level shall not be lowered and shall be retained at the existing 2.1 metres above Ordnance Datum (AOD) These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/ phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development.
Policy
The development to which this permission relates must be begun not later than the expiration of three years beginning with the date of this permission.
Policy
The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: - Location Plan (received 05 April 2023) - Plan View (dated 12 December 2022) - Long Profile (dated 12 December 2022) - Cross Sections 1 (dated 12 December 2022) - Cross Sections 2 (dated 12 December 2022) - Cross Sections 3 (dated 12 December 2022) - Cross Sections 4 (dated 12 December 2022) - Cut Fill Analysis (dated 12 December 2022) - Indicative Section Ditch (dated 12 December 2022)
Policy
No development, including any demolition and groundworks, shall take place until the applicant, or their agent or successor in title, has submitted a Written Scheme of Investigation (WSI) that sets out a strategy for archaeological investigation and this has been approved in writing by the Local Planning Authority. The WSI shall include: 1. The programme and method of site investigation and recording. 2. The requirement to seek preservation in situ of identified features of importance. 3. The programme for post-investigation assessment. 4. The provision to be made for analysis and reporting. 5. The provision to be made for publication and dissemination of the results. 6. The provision to be made for deposition of the archive created. 7. Nomination of a competent person/persons or organisation to undertake the works. 8. The timetable for completion of all site investigation and post-investigation works. Thereafter the development shall only take place in accordance with the approved WSI and the development shall not be brought into use until the Local Planning Authority has confirmed in writing that the requirements of the WSI have been fulfilled or alternative timescales agreed.
Policy
The construction works shall be undertaken in accordance with the following: - Construction Environmental Management Plan (ENV0002776C) (received 01 June 2023) - Method Statement (received 07 July 2023)