  • HIGH 1 - Site surfaced and sealed

    Policy

    Before the development is brought into use, that part of the site to be used by vehicles shall be surfaced, drained and where necessary marked out in a manner to be approved in writing by the local planning authority.

    Reference
    U0106976
  • Amended/approved plans

    Policy

    The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the amended/approved plans listed below: Amended plans: Drawing Title: SITE PLAN. Drawing No: 05. Revision: A (Existing drive shown). Date: 09/03/2023. Received by City of Doncaster Council on the 10.03.2023. Drawing Title: PROPOSED PLAN AND CROSS SECTION. Drawing No: 02. Revison: A (Automated garage door added). Date: 09/03/2023. Received by City of Doncaster Council on the 10.03.2023. Drawing Title: LOCATION PLAN. Drawing No: 04. Revision: A (Alternative access route shown). Date: 09/03/2023. Received by City of Doncaster Council on the 10.03.2023. Approved plans: Drawing Title: Proposed Elevations. Drawing No: 03.

    Reference
    U0106982
  • Approved Plans

    Policy

    The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Proposed Plans - Drawing No 3742-11 - Received 26/01/2023

    Reference
    U0107028
  • materials

    Policy

    The external materials and finishes shall be as follows: Roof - tile effect sheet finish (Brimet Pantile 2000) External walls - render in off-white/cream colour

    Reference
    U0107029
  • Time Limit

    Policy

    The development to which this permission relates must be begun not later than the expiration of three years beginning with the date of this permission.

    Reference
    U0107032
  • Approved Plans

    Policy

    The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: - Planning Location Plan - Electricity Substation (HOW - AWP - CR - XX - DR - A - 1400 Rev P1 - Planning Proposed Site Plan - Electricity Substation (HOW - AWP - CR - XX - DR - A - 1402 Rev P1) - Planning Proposed Substation G.A. (HOW - AWP - CR - XX - DR - A - 1305 Rev 3)

    Reference
    U0107033
  • FRA

    Policy

    The development shall be carried out in accordance with the submitted flood risk assessment by Alan Wood and Partners, referenced 47638 / HOW-AWP-XX-XX-RP-S-0001 and dated 3 February 2023, and the following mitigation measures it details: - Finished floor levels of the substation shall be set no lower than 4.0 metres above Ordnance Datum (mAOD) as per drawing titled 'Planning Proposed Substation G.A, drawing number HOW - AWP - CR - XX - DR - A - 1305'. - The level of the internal switchgear within the substation shall be set no lower than 4.5 metres above Ordnance Datum (mAOD) as per drawing titled 'Planning Proposed Substation G.A, drawing number HOW - AWP - CR - XX - DR - A - 1305'. These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/ phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development.

    Reference
    U0107034
  • British Standard 3998: 2010 Tree Work

    Policy

    Tree surgery work shall be carried out in full accordance with the scheme hereby approved and in compliance with clause 12: Tree felling and stump management and clause 12.4 specifically of British Standard 3998: 2010 Tree Work - Recommendations.

    Reference
    U0107036
  • Replacement tree

    Policy

    {\b Replacement tree to be planted} Following the felling of the one (1) Sycamore tree authorised by this consent, one (1) replacement tree shall be planted on the site. The replacement tree shall be container grown and either 'Selected Standard' size Pyrus calleryana (Ornamental Pear), Tilia cordata Rancho (Rancho Little Leaved Linden) or Tilia cordata Streetwise (Small Leaved Lime Streetwise) in accordance with BS 3936-1:1992 Nursery stock — Part 1: Specification for trees and shrubs unless specifically agreed in writing otherwise. The replacement tree shall be planted within a radius of one metre (1m) of the position of the felled tree and during the first planting season following the date of felling (i.e. October 2023 - March 2024). The Local Planning Authority shall be notified in writing within 7 days of the planting of the tree[s].

    Reference
    U0107037
  • Establishment of replacement tree

    Policy

    {\b Establishment of replacement tree} Should any of the replacement trees planted in compliance with condition 2 die or become damaged, diseased or be removed within five years of planting, it/they shall be replaced with another tree(s) as previously specified in condition 2, unless the local planning authority gives its written approval to any variation.

    Reference
    U0107038