  • CTMP

    Policy

    No development shall take place, including any works of demolition, until a Construction Method Statement has been submitted to and approved in writing by the local planning authority. The approved statement shall be adhered to throughout the construction period. The statement shall provide for: i) the parking of vehicles of site operatives and visitors ii) loading and unloading of plant and materials iii) storage of plant and materials used in constructing the development iv) the erection and maintenance of security hoarding including decorative displays and facilities for public viewing, where appropriate v) wheel washing facilities vi) measures to control noise and the emission of dust and dirt during construction vii) a scheme for recycling/disposing of waste resulting from demolition and construction works

    Reference
    U0111900
  • Approved Plans

    Policy

    The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans and specifications. Location Plan. Date received: 17/05/2023. Site Plan incl. drainage plan. Date received: 10/07/2023. Sewage Treatment Plan Specification. Date received: 10/07/2023. Sewage Treatment Plans. Date received: 17/05/2023.

    Reference
    U0111902
  • Secondary glazing

    Policy

    Secondary glazing shall be in accordance with details provided unless otherwise agreed in writing by the Local Planning Authority.

    Reference
    U0111927
  • PLANS

    Policy

    The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Location Plan, Drawing No: 10790, Rev: B, Received: 6/6/2023 Site Plan- Proposed, Drawing No: 101, Rev: P1, Received: 6/6/2023 Proposed Floorplans, Drawing No: 103, Rev: P1, Received: 6/6/2023 Proposed Elevations, Drawing No: 203, Rev: P1, Received: 6/6/2023

    Reference
    U0111928
  • DELIVERY HOURS

    Policy

    No delivery vehicles (with the exception of smaller transit vans) may arrive, depart, be loaded or unloaded, within the site between the hours of: 10:00 and 19:00 Monday - Friday, and; 09:00 to 18:00 on Saturdays, and; 10:30 and 16:30 on Sundays and Bank Holidays.

    Reference
    U0111929
  • CLASS E(b) ONLY

    Policy

    Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended) and the Town and Country Planning (Use Classes) Order 1987, or any Order revoking and re-enacting that Order with or without modification), the development hereby approved shall only be used/occupied by uses falling within Use Class E(b)- Sale of Food and Drink and for no other purpose (including any other purpose in Class E of the Schedule to the Use Classes Order).

    Reference
    U0111930
  • Approved Plans

    Policy

    he development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: AJA-RP2-KP-B-025 Rev P02 - Gatehouse GA Plan & Roof AJA-RP2-KP-B-026 Rev P02 - Gatehouse Elevations & Section AJA-RP2-KP-B-027 Rev P01 - Welfare GA Plan & Roof AJA-RP2-KP-B-028 Rev P01 - Welfare Elevations & Section AJA-RP2-KP-B-029 Rev P01 - Existing Site Plan AJA-RP2-KP-B-034 Rev P02 - Site Location Plan AJA-RP2-KP-B-035 Rev P03 - Proposed Railport Site Plan AJA-RP2-KP-B-036 Rev P02 - Proposed Site Build Out Plan DWG. No 5045_2111_B General Arrangement Soft Landscape Proposal - Railport Way Expansion (Sheet 1 of 3) DWG. No 5045_2112_B General Arrangement Soft Landscape Proposal - Railport Way Expansion (Sheet 2 of 3) DWG. No 5045_2113_C General Arrangement Soft Landscape Proposal - Railport Way Expansion (Sheet 3 of 3) Drawing No. 2302016MHF - Lighting Schedule prepared by Lighting Project Solutions IP-BWB-DDG-RP2-DR-C-0540 Rev P1 Railport Phase 2 Flood Routing Plan IP-BWB-GEN-RP2-DR-C-0050 Rev P1 Railport Phase 2 Existing & Proposed Impermeable Area Plan IP-BWB-DGT-RP-CL-C-0500 Rev P1 Microdrainage Calculations IP-BWB-DDG-IS-DR-C-0500 Rev C1 - DIP Phase 2 Proposed Drainage Key Plan IP-BWB-DGT-RP2-DR-C-0690 Rev P1 - Proposed Finished Floor Levels IP-BWB-DDG-RP2-DR-C-0555 Rev P1 - Site Wide Maintenance Strategy for Surface and Foul Water Infrastructure Drainage - Sheet 1 DIP-BWB-00-XX-DR-EN-0002_FRA Flood Risk Assessment & Management Addendum Report IP-BWB-GEN-XX-RP-CE-0010_S2-P1 - Drainage Statement for Railport Phase 2 IP_BWB-GEN-XX-RP-TR-0001_S2 P1-TS - Transport Statement Design and Access Statement Revision P01-06-02-2023, prepared by AJA Environmental Management Plan Ref GP.1202.F01, May 2023 prepared by Buckingham Group Contracting Environmental Compliance Report Railport Phase 2, April 2023 prepared by RPS Rail Terminal Landscape and Visual Assessment, June 2023 prepared by LDA Design Ecological Assessment, February 2023 prepared by Ecology Solutions Planning Statement, March 2023 prepared by RPS

    Reference
    U0111956
  • EA 1

    Policy

    The development shall be carried out in accordance with the submitted flood risk assessment by BWB Consultancy, referenced DIP-BWB-00-XX-DR-EN-0002_FRA (BWB Ref NTH-2287-FRA) Revision P3, dated 9 June 2017, and following mitigation measures it details; - Finshed floor levels shall be set no lower than the figures presented in Figure 3.1 of the report. These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing / phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development.

    Reference
    U0111957
  • EA2

    Policy

    Within one month of the date of this permission, a scheme to dispose of foul and surface water shall be submitted for approval in writing by the Local Planning Authority. The scheme shall be implemented as approved.

    Reference
    U0111958
  • EA 3

    Policy

    Within one month of the date of this permission, a plan for the mitigation of damage to the water quality in the River Torne or surface waters both during construction works and once the development is complete, shall be submitted for approval in writing by the Local Planning Authority. The surface waters protection plan shall be carried out in accordance with a timetable for implementation as approved. The scheme shall include the following elements; - details of sediment management techniques that will be used during construction to prevent silt ingress into the watercourse - details of the likely pollutants expected to enter surface waters as a result of direct run-off from the new road and any mitigation required to prevent adverse impacts on water quality.=

    Reference
    U0111959