Planning condition
In accordance with plans specified
Field | Value | Fact links |
---|---|---|
Reference | U0111260 | Facts |
Prefix | planning-condition | Facts |
Name | In accordance with plans specified | Facts |
Dataset | Planning condition | no fact link |
Organisation | Doncaster Metropolitan Borough Council | no fact link |
Start date | no fact link | |
End date | no fact link | |
Entry date | 2025-02-25 | Facts |
Typology | policy | no fact link |
Dataset name | Facts | |
Notes | Unique Condition | Facts |
Reason | To ensure that the development is carried out in accordance with the application as approved. | Facts |
Description | The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: - Application forms - Location Plan, drawing no. DON-POR-001-P, Revision C - Site Plan (Buildings 1, 2 and 5), drawing no. DON-POR-003-P, Revision B - Site Plan (Buildings 3 and 4), drawing no. DON-POR-02-P, Revision A - Site Plan (Building 6), drawing no. DON-POR-004-P, Revision B - Two-storey building: proposed ground floor plan, drawing no. 00-0100, Revision P05 - Two storey building: proposed first floor plan, drawing no. 00-0101, Revision P05 - Two storey building: proposed elevations, drawing no. 00-0200, Revision P06 - Replacement Shop Building: proposed ground floor plan, drawing no. 00-0100, Revision P02 - Replacement Shop Building: proposed elevations, drawing no. 00-0200, Revision P01 - Design and Access Statement Revision A, dated 5th May 2023 - Proposed Foul and Surface Water Drainage Layout, drawing no. 23071-AJF-ZZ-ZZ-DR-D-001, Revision 1 - Drainage Specification: 2 storey shop and training facility, doc no. 23071-AJF-ZZ-ZZ-SP-D-002 - Drainage Works: Designer's Risk Assessment, doc no. 23071-AJF-ZZ-ZZ-HS-D-001 - Proposed Foul and Surface Water Network: Storm Network, pages 1-8, dated 1st June 2023 - Drainage Standard Details - Sheet 1, drawing no. 23071-AJF-ZZ-ZZ-DR-D-003, Revision 1 - Drainage Standard Details - Sheet 2, drawing no. 23071-AJF-ZZ-ZZ-DR-D-004, Revision 1 - Drainage Standard Details - Sheet 3, drawing no. 23071-AJF-ZZ-ZZ-DR-D-005, Revision 1 - Drainage Standard Details - Sheet 4, drawing no. 23071-AJF-ZZ-ZZ-DR-D-006, Revision 1 - Proposed Drainage - Manhole Schedules (Foul and Surface Water), drawing no. 23071-AJF-ZZ-ZZ-DR-D-008, Revision 1 | Facts |
Contents
{
"reference": "U0111260",
"prefix": "planning-condition",
"name": "In accordance with plans specified",
"dataset": "planning-condition",
"organisation-entity": "109",
"start-date": "",
"end-date": "",
"entry-date": "2025-02-25",
"typology": "policy",
"geometry": "",
"point": "",
"entity": 73000840,
"dataset-name": "",
"notes": "Unique Condition",
"reason": "To ensure that the development is carried out in accordance with the application as approved.",
"description": "The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: - Application forms - Location Plan, drawing no. DON-POR-001-P, Revision C - Site Plan (Buildings 1, 2 and 5), drawing no. DON-POR-003-P, Revision B - Site Plan (Buildings 3 and 4), drawing no. DON-POR-02-P, Revision A - Site Plan (Building 6), drawing no. DON-POR-004-P, Revision B - Two-storey building: proposed ground floor plan, drawing no. 00-0100, Revision P05 - Two storey building: proposed first floor plan, drawing no. 00-0101, Revision P05 - Two storey building: proposed elevations, drawing no. 00-0200, Revision P06 - Replacement Shop Building: proposed ground floor plan, drawing no. 00-0100, Revision P02 - Replacement Shop Building: proposed elevations, drawing no. 00-0200, Revision P01 - Design and Access Statement Revision A, dated 5th May 2023 - Proposed Foul and Surface Water Drainage Layout, drawing no. 23071-AJF-ZZ-ZZ-DR-D-001, Revision 1 - Drainage Specification: 2 storey shop and training facility, doc no. 23071-AJF-ZZ-ZZ-SP-D-002 - Drainage Works: Designer's Risk Assessment, doc no. 23071-AJF-ZZ-ZZ-HS-D-001 - Proposed Foul and Surface Water Network: Storm Network, pages 1-8, dated 1st June 2023 - Drainage Standard Details - Sheet 1, drawing no. 23071-AJF-ZZ-ZZ-DR-D-003, Revision 1 - Drainage Standard Details - Sheet 2, drawing no. 23071-AJF-ZZ-ZZ-DR-D-004, Revision 1 - Drainage Standard Details - Sheet 3, drawing no. 23071-AJF-ZZ-ZZ-DR-D-005, Revision 1 - Drainage Standard Details - Sheet 4, drawing no. 23071-AJF-ZZ-ZZ-DR-D-006, Revision 1 - Proposed Drainage - Manhole Schedules (Foul and Surface Water), drawing no. 23071-AJF-ZZ-ZZ-DR-D-008, Revision 1"
}
© Crown copyright and database right 2025
Licensed under the Open Government Licence v.3.0.
Help improve this data
Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.