Planning condition
Drainage D015
Field | Value | Fact links |
---|---|---|
Reference | U0108895 | Facts |
Prefix | planning-condition | Facts |
Name | Drainage D015 | Facts |
Dataset | Planning condition | no fact link |
Organisation | Doncaster Metropolitan Borough Council | no fact link |
Start date | no fact link | |
End date | no fact link | |
Entry date | 2025-02-25 | Facts |
Typology | policy | no fact link |
Dataset name | Facts | |
Notes | Unique Condition | Facts |
Reason | To ensure that the site is adequately drained | Facts |
Description | Details of the proposed septic tank shall be submitted to and approved in writing by the Local Planning Authority prior to the commencement of the development. The septic tank shall not be installed until soakaway tests have been carried out in connection with condition DN14 The septic tank shall be operating prior to the occupation of the development and maintained for the lifetime of the development. | Facts |
Contents
{
"reference": "U0108895",
"prefix": "planning-condition",
"name": "Drainage D015",
"dataset": "planning-condition",
"organisation-entity": "109",
"start-date": "",
"end-date": "",
"entry-date": "2025-02-25",
"typology": "policy",
"geometry": "",
"point": "",
"entity": 73000349,
"dataset-name": "",
"notes": "Unique Condition",
"reason": "To ensure that the site is adequately drained",
"description": "Details of the proposed septic tank shall be submitted to and approved in writing by the Local Planning Authority prior to the commencement of the development. The septic tank shall not be installed until soakaway tests have been carried out in connection with condition DN14 The septic tank shall be operating prior to the occupation of the development and maintained for the lifetime of the development."
}
© Crown copyright and database right 2025
Licensed under the Open Government Licence v.3.0.
Help improve this data
Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.