Planning condition

In accordance with plans specified

Field Value Fact links
Reference U0111260 Facts
Prefix planning-condition Facts
Name In accordance with plans specified Facts
Dataset Planning condition no fact link
Organisation Doncaster Metropolitan Borough Council no fact link
Start date no fact link
End date no fact link
Entry date 2025-02-25 Facts
Typology policy no fact link
Dataset name Facts
Notes Unique Condition Facts
Reason To ensure that the development is carried out in accordance with the application as approved. Facts
Description The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: - Application forms - Location Plan, drawing no. DON-POR-001-P, Revision C - Site Plan (Buildings 1, 2 and 5), drawing no. DON-POR-003-P, Revision B - Site Plan (Buildings 3 and 4), drawing no. DON-POR-02-P, Revision A - Site Plan (Building 6), drawing no. DON-POR-004-P, Revision B - Two-storey building: proposed ground floor plan, drawing no. 00-0100, Revision P05 - Two storey building: proposed first floor plan, drawing no. 00-0101, Revision P05 - Two storey building: proposed elevations, drawing no. 00-0200, Revision P06 - Replacement Shop Building: proposed ground floor plan, drawing no. 00-0100, Revision P02 - Replacement Shop Building: proposed elevations, drawing no. 00-0200, Revision P01 - Design and Access Statement Revision A, dated 5th May 2023 - Proposed Foul and Surface Water Drainage Layout, drawing no. 23071-AJF-ZZ-ZZ-DR-D-001, Revision 1 - Drainage Specification: 2 storey shop and training facility, doc no. 23071-AJF-ZZ-ZZ-SP-D-002 - Drainage Works: Designer's Risk Assessment, doc no. 23071-AJF-ZZ-ZZ-HS-D-001 - Proposed Foul and Surface Water Network: Storm Network, pages 1-8, dated 1st June 2023 - Drainage Standard Details - Sheet 1, drawing no. 23071-AJF-ZZ-ZZ-DR-D-003, Revision 1 - Drainage Standard Details - Sheet 2, drawing no. 23071-AJF-ZZ-ZZ-DR-D-004, Revision 1 - Drainage Standard Details - Sheet 3, drawing no. 23071-AJF-ZZ-ZZ-DR-D-005, Revision 1 - Drainage Standard Details - Sheet 4, drawing no. 23071-AJF-ZZ-ZZ-DR-D-006, Revision 1 - Proposed Drainage - Manhole Schedules (Foul and Surface Water), drawing no. 23071-AJF-ZZ-ZZ-DR-D-008, Revision 1 Facts

Contents

{
    "reference": "U0111260",
    "prefix": "planning-condition",
    "name": "In accordance with plans specified",
    "dataset": "planning-condition",
    "organisation-entity": "109",
    "start-date": "",
    "end-date": "",
    "entry-date": "2025-02-25",
    "typology": "policy",
    "geometry": "",
    "point": "",
    "entity": 73000840,
    "dataset-name": "",
    "notes": "Unique Condition",
    "reason": "To ensure that the development is carried out in accordance with the application as approved.",
    "description": "The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: - Application forms - Location Plan, drawing no. DON-POR-001-P, Revision C - Site Plan (Buildings 1, 2 and 5), drawing no. DON-POR-003-P, Revision B - Site Plan (Buildings 3 and 4), drawing no. DON-POR-02-P, Revision A - Site Plan (Building 6), drawing no. DON-POR-004-P, Revision B - Two-storey building: proposed ground floor plan, drawing no. 00-0100, Revision P05 - Two storey building: proposed first floor plan, drawing no. 00-0101, Revision P05 - Two storey building: proposed elevations, drawing no. 00-0200, Revision P06 - Replacement Shop Building: proposed ground floor plan, drawing no. 00-0100, Revision P02 - Replacement Shop Building: proposed elevations, drawing no. 00-0200, Revision P01 - Design and Access Statement Revision A, dated 5th May 2023 - Proposed Foul and Surface Water Drainage Layout, drawing no. 23071-AJF-ZZ-ZZ-DR-D-001, Revision 1 - Drainage Specification: 2 storey shop and training facility, doc no. 23071-AJF-ZZ-ZZ-SP-D-002 - Drainage Works: Designer's Risk Assessment, doc no. 23071-AJF-ZZ-ZZ-HS-D-001 - Proposed Foul and Surface Water Network: Storm Network, pages 1-8, dated 1st June 2023 - Drainage Standard Details - Sheet 1, drawing no. 23071-AJF-ZZ-ZZ-DR-D-003, Revision 1 - Drainage Standard Details - Sheet 2, drawing no. 23071-AJF-ZZ-ZZ-DR-D-004, Revision 1 - Drainage Standard Details - Sheet 3, drawing no. 23071-AJF-ZZ-ZZ-DR-D-005, Revision 1 - Drainage Standard Details - Sheet 4, drawing no. 23071-AJF-ZZ-ZZ-DR-D-006, Revision 1 - Proposed Drainage - Manhole Schedules (Foul and Surface Water), drawing no. 23071-AJF-ZZ-ZZ-DR-D-008, Revision 1"
}

© Crown copyright and database right 2025

Licensed under the Open Government Licence v.3.0.


Help improve this data

Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.