Development on any land during a period not exceeding 28 consecutive days consisting of: (a) the drilling of boreholes; (b) the carrying out of seismic surveys; or (c) the making of other excavations, and the provision or assembly on that land or adjoining land of any structure required in connection with any of those operations
|
Temporary use of land etc for mineral exploration
|
2020-12-31
|
2020-12-31
|