Fact

8a7cbf4f0400873825ab63bf65167a096eac5e06ac90cec3b243165efc215b30
Field Value
Fact 8a7cbf4f0400873825ab63bf65167a096eac5e06ac90cec3b243165efc215b30
Field description
Value The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans and specifications. OS Plan (site plan). Drawing number: 2023/025/05. Date received: 24/04/2023. Location plan. Drawing number 2023/-25/06. Date received: 24/04/2023. Scheme elevations (proposed elevations). Drawing number: 2023/025/04C. Date received: 21/04/2023. Scheme plans (proposed floor plans). Drawing number: 2023/025/03C. Date received: 21/04/2023.
Entity Approved Plans
Earliest entry date 2025-02-25
Latest entry date 2025-02-25
Latest resource 6e210b1fa5551f87528b09d173fdd0a966e74dcacd9d417ebb30e847ddc5dc1c
Resources
Entry Date Resource
2025-02-25 6e210b1fa5551f87528b09d173fdd0a966e74dcacd9d417ebb30e847ddc5dc1c