SW via interceptor
Provenance
1 result
Fields:
description
Fact | Field | Value | Latest Entry Date | |
---|---|---|---|---|
e539755ca3155224f75ec5512e7323ab87ee4c6a139ee43c72d9dcd259f61319 | description | All surface water run-off from the site, excepting roof water, shall be discharged to the public surface water sewer/land drainage system or Highway Drain via a suitable oil/petrol/grit interceptor in accordance with details submitted and agreed with the Local Planning Authority. | 2025-02-25 |