The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Proposed Elevations: Drawing No. 06 as received 09/05/2023 Proposed Floor Plans (ground floor): Drawing No. 05 as received 09/05/2023 Proposed Floor Plans (first floor): Drawing No. 05.2 as received 03/07/2023 Proposed SIte Plan: Drawing No. 02 as received 09/05/2023
|
In accordance with plans specified
|