Fact
f0243887603ec73e99c12eae1e4edaf2f4daf59d7710bfde51efd6724ba0f2ea
f0243887603ec73e99c12eae1e4edaf2f4daf59d7710bfde51efd6724ba0f2ea
|
description
|
The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans and specifications. Location plan and proposed block plan. Drawing number: 2302_06. Date received: 24/02/2023. Existing and proposed plans and elevations, coach house. Drawing number: 2302_04B. Date received: 01/03/2023. Existing and proposed ground floor plans, orangery. Drawing number: 2302_01A. Date received: 01/03/2023. Proposed elevations, orangery. Drawing number: 2302_03B. Date received: 01/03/2023.
|
Approved Plans
|
2025-02-25
|
2025-02-25
|
6e210b1fa5551f87528b09d173fdd0a966e74dcacd9d417ebb30e847ddc5dc1c
|
Resources
6e210b1fa5551f87528b09d173fdd0a966e74dcacd9d417ebb30e847ddc5dc1c
|