Fact

f046ac038eb0a4a404279956442fcb319b5b4644dcc5938af6a8ae82706bd005
Field Value
Fact f046ac038eb0a4a404279956442fcb319b5b4644dcc5938af6a8ae82706bd005
Field description
Value The development shall be carried out in accordance with the submitted flood risk assessment by WtFR Ltd referenced WTFR-FRA-2023/03/Q21 Rev E, dated 8 June 2023, and the following mitigation measures it details: - Finished floor levels shall be set no lower than 2.88 metres above Ordnance Datum (mAOD) to meet the existing site floor levels - Any water sensitive or critical apparatus to be set no lower than 4.4mAOD. - Flood resistance and resilience measures shall be included, as detailed in Section 9.4 of the submitted FRA. These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/ phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development.
Entity Environment Agency - FRA Compliance
Earliest entry date 2025-02-25
Latest entry date 2025-02-25
Latest resource 6e210b1fa5551f87528b09d173fdd0a966e74dcacd9d417ebb30e847ddc5dc1c
Resources
Entry Date Resource
2025-02-25 6e210b1fa5551f87528b09d173fdd0a966e74dcacd9d417ebb30e847ddc5dc1c