FRA
Provenance
1 result
Fields:
description
Fact | Field | Value | Latest Entry Date | |
---|---|---|---|---|
e33b2a0a0004f945d9c9bd2de22339d9cc8dcf76e3105d3b622440c5ebed7fc2 | description | The development shall be carried out in accordance with the submitted flood risk assessment by Alan Wood and Partners, referenced 47638 / HOW-AWP-XX-XX-RP-S-0001 and dated 3 February 2023, and the following mitigation measures it details: - Finished floor levels of the substation shall be set no lower than 4.0 metres above Ordnance Datum (mAOD) as per drawing titled 'Planning Proposed Substation G.A, drawing number HOW - AWP - CR - XX - DR - A - 1305'. - The level of the internal switchgear within the substation shall be set no lower than 4.5 metres above Ordnance Datum (mAOD) as per drawing titled 'Planning Proposed Substation G.A, drawing number HOW - AWP - CR - XX - DR - A - 1305'. These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/ phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development. | 2025-02-25 |