Skip to main content
FRA Compliance
Provenance

Filters

Field

1 selected

Field

Clear

1 result

Fact Field Value Latest Entry Date
0f7890dae6673c8416732b9952aee168ba57e9e37926565622050e34d2e534f5 description The development shall be carried out in accordance with the submitted flood risk assessment (unreferenced, dated 4th May 2023, compiled by Howard J Wroot Chartered Surveyor) and the following mitigation measures it details: - Finished floor levels shall be set no lower than 3.8 metres above Ordnance Datum (AOD) - A safe refuge shall be incorporated as per drawing referenced 1178, 29/4/23, Proposed Floor Plan. These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/ phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development. 2025-02-25