Skip to main content

Filters

Field

1 selected

Field

Clear

1 result

Fact Field Value Latest Entry Date
c14bea4afe8e9ab305161b0fd77385e09654eee9b1b63aac9ef9f24e76007181 description The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Proposed Elevations: Drawing No. 06 as received 09/05/2023 Proposed Floor Plans (ground floor): Drawing No. 05 as received 09/05/2023 Proposed Floor Plans (first floor): Drawing No. 05.2 as received 03/07/2023 Proposed SIte Plan: Drawing No. 02 as received 09/05/2023 2025-02-25